Journal of Earth Sciences and Geotechnical Engineering

Mystery of Mosul Dam the Most Dangerous Dam in the World: Experts Proposals and Ideas on Mosul Dam

  • Pdf Icon [ Download ]
  • Times downloaded: 10378
  • Abstract

    During and after the construction of Mosul Dam, in Iraq, all the studies expressed a clear concern on the fact that the region of the dam suffers from extensive presence of soluble rock formations that might undermine the safety of the dam with its large reservoir. Most of the studies dealt with foundation treatment and safety hazards due to the dissolution of gypsum and anhydrite. To overcome the problem, grouting operations were performed. The seepage of water continued and this highlighted the possibility of the dam failure. Different grouting techniques and methods were suggested but the results were the same. Finally, it was decided to limit the maximum operation water level to EL. 319 m (a.s.l.) instead of EL.330 m (a.s.l.). This recommendation has remained in force up to now with the loss of sizable storage of irrigation water and power potential.